Barry Baker
|
About
Role in the KNI
My biggest role in the KNI teams is to provide help with new project installations as well as doing maintenance on equipment that is needed. On a daily basis I conduct walkthroughs of the labs, including the Keck lab that houses the TF-30.
Experience
I have been with KNI since Oct 2017, before that I spent form April 2011 to Oct 2017 being the Laboratory manager for Dr. Oskar Painter at California Institute of Technology. I was responsible for taking care of 3 optical labs and a cleanroom facility for his research group. IN his group I was the lead person for installations of many new pieces of equipment including 2 Dilution Refrigerators, an E-beam Evaporator and an Atomic layer deposition tool.
List of Lab Responsibilities
Daily
- Lab Walkthrough
- Back up to Lab Coordinator
Equipment
- Chillers
- TF-30 service chase
Project involvement
Sputter tool installation
Along with Alex and Bert, I was involved with the installation of all utilities needed for the sputter tools, including all water, CDA, N2 and gas lines.
ALD installation
Along with Nathan and Bert, I was involved with the installation of all utilities for the Oxford ALD system, this including running new gas lines and manifolds for the Oxford service chase as well as CDA,N2 and water lines.
Personal
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat.